Non-Compliance detail


  
Summary
 
Licence number: 726
Annual Return Start: 01 Jan 2019
Annual Return End: 31 Dec 2019
Date Received: 25 Feb 2020
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
U1.1 An EIS for the discharge pipeline to the Cox's river was not lodged by 31st December 2019 S.58 notice issued to change/amend licence conditions(s) 1
L2.4 Metal/Metaloid monitoring results exceed limits for discharge at LDP02 Non-compliance(s) under investigation 4
L 2.4 Chloride concentration recorded at LDP02 in January 2019 Non-compliance(s) under investigation 1